ADR guides for EHS managers
How to classify hazardous waste under ADR (step by step)
A 6-step method to assign a UN number, class and packing group to a hazardous waste under ADR 2025, including mixtures and waste of unknown composition.
EWC waste code vs UN number: what is the difference?
Why a hazardous waste code (EWC / List of Waste) and an ADR UN number are two different ledgers, and how to keep both consistent per waste stream.
ADR 1.1.3.6: the 1000-point rule explained (with calculator)
How the ADR 1.1.3.6 partial exemption works for waste pickups: transport categories, multiplying factors and a free calculator.
Who is responsible for what under ADR? Consignor, carrier and DGSA
ADR responsibilities for hazardous waste producers: consignor duties (1.4.2.1), loader and packer duties, and when you must appoint a Dangerous Goods Safety Adviser.
ADR vs US DOT: shipping hazardous waste in Europe and the US
Key differences between ADR (Europe) and 49 CFR HMR (US DOT) for hazardous waste: UN vs NA numbers, manifests, the word WASTE, DGSA vs hazmat training.
Waste lithium batteries under ADR: SP 636, SP 377 and SP 376 explained
How to ship end-of-life, damaged and defective lithium batteries (UN 3480, 3481, 3090, 3091) under ADR 2025: SP 636, SP 377 with P909, SP 376 with P908/LP904 and P911/LP906, marks and transport document.
Turn your ADR waste data into a clean, audit-ready inventory
Upload your waste invoices, manifests and registers. Wastetide's AI extracts every stream — waste code, UN number, volumes, costs — and flags inconsistencies for your DGSA to review. No change to your operations.
Further reading
From the Wastetide blog
- ADR 2027: what changes on 1 January 2027 for hazardous waste and battery shipments — New battery UN numbers, damaged-battery paperwork, eased rules for empty drums, IBCs and used equipment. Mandatory from 1 July 2027.
- EU Waste Shipment Regulation 2024/1157: what changes for cross-border industrial waste — Applies since 21 May 2026: digital procedures in DIWASS, stricter contracts, a ban on shipments for disposal and plastic export limits.
- The end of paper hazardous waste manifests: what EPA's paper sunset rule means for EHS teams — EPA wants to retire paper manifests 24 months after its final rule, while electronic manifests are still under 1% of submissions.
- Lithium-ion UPS batteries: what EPA's coming universal waste rule means for data center EHS teams — EPA is drafting a dedicated universal waste category and the House passed the BRACE Act. What EHS managers should do now.
- ESRS E5 waste disclosures after the Omnibus: the data EHS teams actually need — The CSRD now targets fewer companies, but waste outflows under ESRS E5 remain the data-heavy part of the report.
More free references by Wastetide: US hazardous waste map (urbanmines.us) · Secondary Materials Terminal (secondarymaterials.ai)